![]() |




Designed to accommodate 500 students in grades 9-12, this 92,547 sq. ft. facility shares the same campus as the former high school, now serving the district as a middle school. The primary design goal of this project was to create a new image for the district while blending the new facility into the existing infrastructure.
The new building features a 500-seat auditorium to host musicals and concerts. This space encourages community use while maintaining the security of the academic areas. Classroom wings are designed for maximum visibility and efficient travel between spaces. The library/technology center forms an academic focal point, while the science wing features 3 combination lecture-labs.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
![]() |
|
|||||||||||||||
| |
|
|
|
|
|||||||||||||
| |
|
||||||||||||||||
![]() |
|
||||||||||||||||
RIDGEWOOD HIGH SCHOOL Ridgewood Local Schools |
|
||||||||||||||||
| |
|||||||||||||||||
Completed
Fall 2002 |
|
||||||||||||||||
|
|
|
||||||||||||||||
| |
|||||||||||||||||
| |
|||||||||||||||||
| |
|||||||||||||||||
| |
|||||||||||||||||
| |
|||||||||||||||||
| |
|||||||||||||||||
| |
|||||||||||||||||
| |
|||||||||||||||||
| |
|
||||||||||||||||
Copyright
2008© MKC Associates, Inc |
|
||||||||||||||||
| |
|||||||||||||||||